Project Overview

date completed
April 2024

The scope of work was to refurbish the diesel storage tanks at the Katherine Power station. the tanks required varying works. All repairs were to the tanks comply with API 653. All repairs required NDT post welding. 100% Magnetic particle testing and 100% vacuum box testing, and hydrotesting to certify repairs. SIMPEC were awarded further SMP repair works on the tanks subsequent to the successful completion of initial works completed for Territory Generation.

Client Overview

Territory Generation is the Northern Territory’s largest wholesale electricity producer, owning and operating eight power stations. Utilising gas, diesel and solar technologies to generate electricity for the Territory’s major population centres and maintain generation reliability. A provider for wholesale electricity, focusing on transitioning the fleet to supply the Northern Territory’s power systems reliably and sustainably.

Scope of Work

Mechanical/Structural/Piping Installation & Repair Works to Diesel Storage Tanks:

  • Cut & remove tank (15m Dia) floor island
  • Installation & welding of new tank floor (5.3T steel)
  • Full External Shell and Roof
  • Tank Signage
  • Tank Annular Plate Sealing Works
  • Mechanical works
  • Bund Floor Sealing Works
  • Hydrotesting Tank
  • All tank internal works completed under CSE permits

This contract was established due to SIMPEC’s unwavering focus on ensuring our customer needs are met and our teams work safely each and every day.

Key Facts

  •  Practical completion achieved with Zero Defects
  •  Project completed ahead of Schedule  
  •  Project Peak Manning Level up to 6
  •  Project achieved zero MTI/LTI over 1,260 manhours